rate analysis for 1m cube concrete

Estimating and-costing book - SlideShare

67 Estimation and Costing Preparation of Unit rates for finished items of words I a) Cement Concrete in foundation (1:5:10) S.No. DescriptionofItem Quantity Unit Rate Per Amount 40mmHBGMetal Sand Cement Mason Ist Class Mason 2nd Class Manmazdoor Women Mazdoor Add Extra 15%on M.L Add T.O.T. @4% Sundries 0.92 0.46 0.092 0.06 0.14 1.80 1.40 Cum ...


1m3 Concrete Quantity Calculation | 1m3 Concrete Ratio

The grade of concrete is also termed as C16/20, C20/25, C25/30, etc. 1MPA = N/mm 2 Several grades of concrete contains various concrete mix proportions or ratios. How to work out the quantities of cement, sand and aggregate in 1m 3 of concrete:-Guess a nominal mix grade of concrete as M20.


How to calculate cement, sand, & water for a 1m2 block ...

Answer (1 of 3): Brick size for block work is 200mm x 200mm x 400mm. So the quantity of block work in 1sqm area of Wall is : 1sqm x 0.2 = 0.2cum. Quantity of Cement Mortar required is 11% to 16% of 0.2cum. Maximum mortar is required( 20% of the quantity of brick work ) while using small size br...


Concrete 1 tonne (Metric) mass to cubic meters converter

How heavy is concrete? Calculate how many cubic meters ( m3 ) of concrete are in 1 tonne (Metric) ( 1 t ). Specific unit weight of concrete - amount properties converter for conversion factor exchange from 1 tonne (Metric) t equals = 0.42 cubic meters m3 exactly for the masonry material type. To convert concrete measuring units can be useful when building with concrete and where handling of ...


How To Calculate Cement, Sand & Aggregates Quantity in ...

As we know that 1m 3 = 35.31 CFT. For Calculation in Cubic Feet = 0.42 x 35.31 = 14.83 Cubic Feet . CALCULATION FOR AGGREGATE QUANTITY; Consider volume of concrete = 1m 3 . Dry Volume of Concrete = 1 x 1.54 = 1.54 m 3. Aggregate = (3/5.5) x 1.54 = 0.84 m 3 ∴ 3 is a part of cement, 5.5 is sum of ratio. Density of Aggregate is 1500/m 3 ...


How To Calculate Cement, Sand And Coarse Aggregate For ...

So the required concrete volume = 0.42 m 3. Now we have calculated the required volume. It's time to calculate the micro-ingredients. Concrete Material Calculation. For the above slab volume ( 5m x 2m x 0.1m) = 1 m 3. We need 1 m 3 of wet volume concrete of M20 Mix, (Mix Ratio, M20 = 1: 1.5 : 3)


Concrete Strength at 7 Days Spreadsheet - CivilWeb ...

Concrete Maturity Testing. Concrete maturity testing can be undertaken using the same concrete cube tests as are used for general compressive strength tests and compliance testing. Maturity testing usually includes for 3 days, 7 days cube strength and 28 days. If required the maturity testing can include longer periods of 60 or 90 days.


General notes to BSR BUILDING SCHEDULE OF RATES

Rates Analysis For Calculating Material and Labour for building works ... To convert Rate per To Rate per Multiply the Present Rate by Cube M3 0.353 Square M2 0.108 Sq.ft. M2 10.764 L.ft. M 3.281 03. ... less than 600mm girth for splays or chamfers less than 300mm measured on the splay nor for holes or ducts formed in the concrete less than 1m ...


What Is In 1 Cubic Metre Mix of Concrete? [Infographic ...

Answer (1 of 5): Detailed analysis on M20 = 1:1.5:3 (Ratio) IST - Initial Setting Time FST - Final Setting Time As we know that during concreting when we place wet concrete, it gets harden after certain standard time( 30 mins IST & 10hrs FST), considering same We have to take a factor of safe...


Concrete Calculator

This free concrete calculator estimates the amount of concrete necessary for a project, and can account for different shapes and amounts of concrete. Explore other calculators related to housing or building, as well as hundreds of other calculators addressing finance, math, fitness, health, and more.



Cubic Meter | Meter Cube | Unit Volume

A cubic meter is an SI unit, that represents the volume of the cube with length, width and height equal to 1 meter. Calculator cubic meter here at BYJU'S. Convert …


How to Calculate Cement, Sand and Aggregate required …

Total weight of concrete ingredients = 50+115+209+27.5 = 401.5 say 400 kg. Density of concrete = 2400 kg/cum. So, 1 bag of cement produces = 400/2400 = 0.167 cum. No. of bags required for 01 cum of concrete = 1/0.167 = 5.98 bags ~ 6 bags. From above, if the concrete mix is 1:2:4, to get a cubic meter of concrete we require. 1.Cement = 6 bags ...


RATE ANALYSIS OF BRICKWORK – we civil engineers

Assuming:- Volume of brickwork = 1m³ Size of brick--->19x9x9 cm Thickness of mortar = 10mm (1cm) Quantity of Bricks:- No. of bricks = Volume of brickwork/ volume of 1 brick with mortar Volume of 1 Brick with mortar = 0.20x0.10x0.10=0.002 m³ ∴ No. of bricks = 1/0.002 = 500 No's Quantity of cement:- Volume of…


Mix Design Of Concrete | Concrete Mix Design | M 25 Mix ...

For making trial -1, mass of ingredients required will be calculated for 4 no's cube assuming 25% wastage. Volume of concrete required for Making 4 cubes = 4 x (0.15 3 x1.25) = 0.016878 m 3; Wt. of Cement = (383.2 x 0.016878) kg/m 3 = 6.47 kg; Wt. of Water = (191.6 x 0.016878) kg/m 3 =3.23 kg


Quantity and Rate Analysis for Reinforced Concrete ...

For rate analysis of RCC, we need to multiply each quantity with their rates to get the amount for every item of work. Rates vary from place to place and time to time. It is advisable to assume local rates or standard rates of the place. The sum total of all the …


How many bags of cement are in one cubic meter of concrete ...

Answer (1 of 10): Assume M20 Garde For M20 = 1:1.5:3 1 cement 1.5 sand 3 aggregate 1M^3 cement = 1440k/m^3 1M^3 sand = 1600kg/m^3 1M^3 aggregate 1800kg/m^3 Find to 50 kg cement ? 1 bag cement volume = 50/1440= 0.0347 Volume of cement 50 kg cement = 0.0347 Sand Volume = 0.0347×1.5 = 0....


How to Calculate Steel Quantity Per Cubic Meter | Quantity ...

Steel Weight is equal to 0.008 x 7850 is equal to 62.80 kg/m 3. Utmost/Maximum steel percentage is equal to 6.0%. Steel Quantity is equal to (6.0/100) x 1 is equal to 0.06 m 3. Steel Weight is equal to 0.06 x 7850 is equal to 471 kg/m 3. Foundation. Least/Minimum steel percentage is equal to 0.50%.


CENTRAL PUBLIC WORKS DEPARTMENT ANALYSIS OF …

2. Analysis of Rates for Delhi 2014 incorporates most of the analysis of items of Analysis of Rates for Delhi 2013 with updated correction slips, including analysis of existing items and also corresponding new items introduced in DSR 2014. 3. Analysis of Rates for Delhi, 2014 is published in two volumes i.e. volume I & II as under: Volume Sub ...



Cement Concrete Calculator | PCC Calculator | RCC ...

Calculate cement concrete mix design or estimate how much cement concrete volume is required for your construction using our free online calculator. Know exactly how many bags, kg and ton of cement, sand and aggregate is needed of specific cement, sand and aggregate ratio (m20, m15, m10, m7.5)


Ready-mixed concrete pricing guide | Hanson UK

Our pricingThere is no flat rate for ready-mixed concrete as a number of factors can affect the cost. These include cement content, delivery distance, lead time and the inclusion of any additives or fibres.The first step is to work out how much concrete you need. The easiest way to do this is by using our concrete calculator. It asks for the basic shape of the area you are working with ...


Rate of Strength Gain of Concrete | Concrete Strength Over ...

Rate of strength gain of concrete: To determine the rate of gain of strength of concrete, there is a need to select period shorter than 28 day, as 28 day is considered to be the reference time. In concrete practice, it is accepted that after 28 days concrete usually gains most of its strength. Strength determined at an early stage say after 7th ...


UNIT RATES FOR DEMOLITION, RECLAMATION AND …

Ref nr Cost Item Unit Rate Unit Notes 1 Concrete Demolition cost, excluding screening & sorting and disposal of waste 1.1 Heavy concrete thickness greater than 750 mm : Rands R 1 283,62 /m³ 1.2 Medium concrete thickness between 750 and 250 mm : Rands R 647,39 /m³ 1.3 Light concrete thickness less than 250 mm : Rands R 407,41 /m³


Compressive Strength of Concrete and Concrete Testing ...

Rate of Sampling of Concrete. The rate of the sampling depends on the quantity of the concrete to be poured in a particular concrete. For smaller concrete, the sampling rate is higher compared with large volume concrete. The following table extracted from BS 5328: Part 1 indicates the rates to be considered in the sampling of concrete.


How to Calculate Cement, Sand and Aggregate required for 1 ...

Total weight of concrete ingredients = 50+115+209+27.5 = 401.5 say 400 kg. Density of concrete = 2400 kg/cum. So, 1 bag of cement produces = 400/2400 = 0.167 cum. No. of bags required for 01 cum of concrete = 1/0.167 = 5.98 bags ~ 6 bags. From above, if the concrete mix is 1:2:4, to get a cubic meter of concrete we require. 1.Cement = 6 bags ...



Rate analysis of brickwork - calculate quantity and cost ...

Rate analysis for 1m2 of brickwork masonry. For calculation rate per sq m of brickwork, We have brickwork volume = 1m3 and width of brick with mortar = 0.1m, then area of brickwork = 1/0.1 = 10m2. 10m2 brickwork cost = INR 7384, so rate and cost per sq meter of brickwork = 7384/10= 738.4 = INR 740. Rate per square metre for brickwork is INR 740.


IS 516 (1959): Method of Tests for Strength of Concrete

IS:516-1959 Indian Standard METHODS OF TESTS FOR STRENGTH OF CONCRETE o. FOREWORD 0.1 This Indian Standard was adopted by the Indian Standards Institution on 10 November 1959, after the draft finalized by the Cement and Concrete Sectional Committee had been approved by the Building Division Council. 0.2 Testing plays an important role in controlling the quality of cement ...


How to price/quote for concrete works - Structville

The unit of concrete in construction is specified in cubic metres (m 3).For instance, if a floor slab has a net area of 250 m 2, and a thickness of 150 mm, the volume of concrete required will be stated as (250 x 0.15 = 37.5 m 3).In the bill, a contractor is expected to state the cost of casting a cubic metre of the specified grade concrete (say grade 25), which can be used to relate the cost ...


Concrete Calculator - Estimate Cement, Sand, Gravel ...

Concrete mix estimation. Our mix-on-site concrete calculation is based on batching by volume (Large construction sites employ batching by weight which is more exact). You can also estimate the quantity of sand and gravel required by weight; Simply multiply the volumetric quantity of sand and gravel with 1400 kg/m 3 (bulk density of sand) and ...